Problem

You must schedule a list of jobs over exactly d days. The jobs depend on each other, so they must be done in the given order: job i can start only after every job before it is finished. Each day you must finish at least one job.

jobDifficulty[i] is the difficulty of job i. A day’s difficulty is the largest difficulty among the jobs done that day, and a schedule’s difficulty is the sum over all d days.

Return the minimum difficulty of a valid schedule, or -1 if no schedule exists.

Examples

Input: jobDifficulty = [3,1,8,2], d = 2
Output: 10

Do jobs 3, 1 and 8 on day one (8) and job 2 on day two (2): 10. Putting the 8 with the 2 instead costs 3 + 8 = 11.

Input: jobDifficulty = [5,5], d = 3
Output: -1

Two jobs cannot fill three days.

Input: jobDifficulty = [2,4,1], d = 3
Output: 7

Three jobs in three days leaves one job per day: 2 + 4 + 1 = 7.

Constraints

Approaches

Follow-up

A monotonic stack brings each day’s layer down to O(n): for a fixed number of days, the best value for prefix i can reuse the work of the nearest earlier job that is harder than job i - 1, for O(n·d) overall. See the use cases for blocks of bounded length worth their maximum, and for days that cost their spread.

Related problems

Start free on Cariara · Coding problems · System design studio

Starting Python
No results yet.

          
↑↓ move ↵ open esc close

Labs

Loading labs…

Run with your own input

Starting Python

Loading Python…